subject
Mathematics, 07.03.2020 05:39 willoughbysierra

A manufacturing process is designed to produce bolts with a 0.75-inch diameter. Once each day, a random sample of 36 bolts is selected and the bolt diameters recorded. If the resulting sample mean is less than 0.740 inches or greater than 0.760 inches, the process is shut down for adjustment. The standard deviation for diameter is 0.02 inches.

What is the probability that the manufacturing line will be shut down unnecessarily? (Hint: Find the probability of observing an x in the shutdown range when the true process mean really is 0.75 inches. Round your answer to four decimal places.)

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
Gh bisects fgi. find the measure of hgi •15° •21° •10° •8°
Answers: 2
question
Mathematics, 21.06.2019 20:00
Given the two similar triangles, how do i find the missing length? if a=4, b=5, and b'=7.5 find a'
Answers: 1
question
Mathematics, 21.06.2019 21:00
If u good at math hit me up on insta or sum @basic_jaiden or @ and
Answers: 1
question
Mathematics, 21.06.2019 23:30
Written as a simplified polynomial in standard form, what is the result when (2x+8)^2(2x+8) 2 is subtracted from 8x^2-38x 2 −3?
Answers: 3
You know the right answer?
A manufacturing process is designed to produce bolts with a 0.75-inch diameter. Once each day, a ran...
Questions
question
Mathematics, 18.03.2021 09:40
question
Spanish, 18.03.2021 09:40
question
Mathematics, 18.03.2021 09:40
Questions on the website: 13722360