The operations manager of a body and paint shop has five cars to schedule for repair. He would like to minimize the makespan to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body and paint work on each are as follows: Car Body Work (hrs) Paint (hrs) A 10 2 B 5 4 C 7 5 D 3 6 E 1 7 What is the optimum sequence (first car to last)?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
What is the base of 1/9 to the power of 2
Answers: 1
question
Mathematics, 21.06.2019 20:00
Which fraction is equal to 1hole and 2/5? a.3/5 b.75 c.57 d.73
Answers: 2
question
Mathematics, 21.06.2019 23:30
Katie wants to collect over 100 seashells. she already has 34 seashells in her collection. each day, she finds 12 more seashells on the beach. katie can use fractions of days to find seashells. write an inequality to determine the number of days, dd, it will take katie to collect over 100 seashells.
Answers: 1
question
Mathematics, 22.06.2019 00:20
Ze trinomial x2 + bx – c has factors of (x + m)(x – n), where m, n, and b are positive. what is ze relationship between the values of m and n? explain how you got ze answer
Answers: 2
You know the right answer?
The operations manager of a body and paint shop has five cars to schedule for repair. He would like...
Questions
question
History, 18.07.2019 22:40
Questions on the website: 13722361