subject
Mathematics, 04.03.2020 04:48 joejoefofana

A builder of houses needs to order some supplies that have a waiting time Y for delivery, with a continuous uniform distribution over the interval from 1 to 4 days. Because she can get by without them for 2 days, the cost of the delay is fixed at $400 for any waiting time up to 2 days. After 2 days, however, the cost of the delay is $400 plus $50 per day (prorated) for each additional day. That is, if the waiting time is 3.5 days, the cost of the delay is $400 $50(1.5)
Find the expected value of the builder’s cost due to waiting for supplies.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Acircular garden with radius of 8 feet is surrounded by a circular path with a width of 3 feet. what is the approximate area of the path alone? use 3.14 for π
Answers: 3
question
Mathematics, 21.06.2019 19:30
Atemperature of 1.64â—¦f corresponds to answer in units of â—¦c.
Answers: 1
question
Mathematics, 21.06.2019 20:30
Solve each quadratic equation by factoring and using the zero product property. n^2 - 49 = 0
Answers: 2
question
Mathematics, 21.06.2019 22:50
He graph of f(x) = |x| is stretched by a factor of 0.3 and translated down 4 units. which statement about the domain and range of each function is correct? the range of the transformed function and the parent function are both all real numbers greater than or equal to 4. the domain of the transformed function is all real numbers and is, therefore, different from that of the parent function. the range of the transformed function is all real numbers greater than or equal to 0 and is, therefore, different from that of the parent function. the domain of the transformed function and the parent function are both all real numbers.
Answers: 3
You know the right answer?
A builder of houses needs to order some supplies that have a waiting time Y for delivery, with a con...
Questions
question
History, 28.10.2019 07:31
Questions on the website: 13722367