An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. The line will operate for 450 minutes per day. a. What are the minimum and maximum cycle times

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Can someone check my answer? you : )
Answers: 1
question
Mathematics, 21.06.2019 16:50
The vertices of a triangle are a(7,5), b(4,2), c(9,2). what is m
Answers: 2
question
Mathematics, 21.06.2019 17:30
Thelime contains the point(-3,0) and parallel x-3y=3( show all work)
Answers: 3
question
Mathematics, 21.06.2019 18:30
10% of 1,900,000. show me how you got the answer
Answers: 2
You know the right answer?
An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total tim...
Questions
question
History, 02.07.2019 10:00
question
Social Studies, 02.07.2019 10:00
Questions on the website: 13722360