subject
Mathematics, 26.02.2020 04:59 reyesortiz6955

A process that fills packages is stopped whenever a package is de- tected whose weight falls outside the specification. Assume that each package has probability 0.01 of falling outside the specification and that the weights of the packages are independent.
A) Find the mean number of packages that will be filled beforethe process is stopped. B) Find the variance of the number of packages that will befilled before the process is stopped. C) Assume that the process will not be stopped until fourpackages whose weight falls outside the specification are detected. Find the mean and variance of the number of packages thatwill be filled before the process is stopped.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
Rewrite the hyperbolic equation 4y^2 -9x^2 +54x-8y-113=0
Answers: 1
question
Mathematics, 21.06.2019 17:30
1mile equals approximately 1.6 kilometers. which best approximates the number of miles in 6 kilometers?
Answers: 1
question
Mathematics, 21.06.2019 18:30
Solve 2x2 + 8 = 0 by graphing the related function. there are two solutions: . there are no real number solutions. there are two solutions: 2 and -2
Answers: 3
question
Mathematics, 21.06.2019 20:00
The distribution of the amount of money spent by students for textbooks in a semester is approximately normal in shape with a mean of $235 and a standard deviation of $20. according to the standard deviation rule, how much did almost all (99.7%) of the students spend on textbooks in a semester?
Answers: 2
You know the right answer?
A process that fills packages is stopped whenever a package is de- tected whose weight falls outside...
Questions
Questions on the website: 13722367