subject
Mathematics, 21.02.2020 17:31 alvaradorosana05

A worker takes a random sample of 150 bolts and finds that 18 of them are either too long or too short, thus making them unusable. Estimate the number of unusable bolts in a production of 11,000 bolts.

1,320 bolts
860 bolts
340 bolts
450 bolts

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
20 points! asap! a is known to be 6,500 feet above sea level; ab = 600 feet. the angle at a looking up at p is 20°. the angle at b looking up at p is 35°. how far above sea level is the peak p? find the height of the mountain peak to the nearest foot. height above sea level =
Answers: 1
question
Mathematics, 21.06.2019 14:30
You’re repairing a large rectangular aquarium. the final step is to cover the glass with a protective film. the front and back of the aquarium measure 4 meters by 2 meters, and the sides of the aquarium measure 3 meters by 2 meters. how many square meters of protective film do you need? ( )
Answers: 1
question
Mathematics, 21.06.2019 17:00
Of the ones listed here, the factor that had the greatest impact on the eventual destruction of native americans' ways of life was the development of the a) automobile. b) highway. c) railroad. d) steamboat.
Answers: 3
question
Mathematics, 22.06.2019 00:30
Which equation represents h for right triangle abc
Answers: 3
You know the right answer?
A worker takes a random sample of 150 bolts and finds that 18 of them are either too long or too sho...
Questions
question
Advanced Placement (AP), 22.03.2021 16:50
question
Mathematics, 22.03.2021 16:50
Questions on the website: 13722362