Mathematics, 21.02.2020 06:24 jstephanie644

. A computer rework center has the capacity to rework 300 computers per day. The expected number of computers needing to be reworked per day is 225. The center is paid $26 for each computer reworked. The fixed cost of renting the reworking equipment is $250 per day. Work space rents for $150 per day. The cost of material is $18 per computer and labor costs $3 per computer. What is the break-even number of computers reworked per day?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Aquantity with an initial value of 3900 decays exponentially at a rate of 35% every hour. what is the value of the quantity after 0.5 days, to the nearest hundredth?
Answers: 1
question
Mathematics, 21.06.2019 17:40
Which number produces a rationale number when multiplied by 1/5
Answers: 1
question
Mathematics, 21.06.2019 19:00
Acompany manufactures large valves, packed in boxes. a shipment consists of 1500 valves packed in 75 boxes. each box has the outer dimensions 1.2 x 0.8 x 1.6 m and the inner dimensions 1.19 x 0.79 x 1.59 m. the boxes are loaded on a vehicle (truck + trailer). the available capacity in the vehicle combination is 140 m3. each valve has a volume of 0.06 m3. - calculate the load factor on the box level (%). - calculate the load factor on the vehicle level (%). - calculate the overall load factor (%).
Answers: 1
question
Mathematics, 21.06.2019 21:30
Acd that is originally priced at $15.85 red-tagged for the sale. what is the sale price of the cd
Answers: 1
You know the right answer?
. A computer rework center has the capacity to rework 300 computers per day. The expected number of...
Questions
question
Biology, 04.01.2020 10:31
question
Mathematics, 04.01.2020 10:31
question
Mathematics, 04.01.2020 10:31
question
English, 04.01.2020 10:31
Questions on the website: 13722361