Mathematics, 20.02.2020 07:40 bellamuniz2015p23zr7
16.4 A 12-station automated production line has an ideal cycle time of 24 sec. Line stops occur on average once every 20 cycles. When a line stop occurs, average downtime is 3.0 min. Cost of each starting work part is $1.55, and the cost to operate the line is $66/hr. Tooling cost is $0.13 per work part. Determine (a) average hourly production rate, (b) line efficiency, and (c) cost of a workpiece produced.
Answers: 1
Mathematics, 22.06.2019 02:00
Robert plans to make a box-and-whisker plot of the following set of data. 27, 14, 46, 38, 32, 18, 21 find the lower quartile, the median, and the upper quartile of the set? lower quartile: 19.5; median: 29.5; upper quartile: 42 lower quartile: 14; median: 27; upper quartile: 46 lower quartile: 18; median: 27; upper quartile: 38 lower quartile: 16; median: 29.5; upper quartile: 42
Answers: 3
Mathematics, 22.06.2019 02:40
How many significant figures are there in the number 10.76?
Answers: 1
16.4 A 12-station automated production line has an ideal cycle time of 24 sec. Line stops occur on a...
History, 19.10.2020 07:01
English, 19.10.2020 07:01
Health, 19.10.2020 07:01
History, 19.10.2020 07:01
English, 19.10.2020 07:01
Mathematics, 19.10.2020 07:01
Physics, 19.10.2020 07:01
Mathematics, 19.10.2020 07:01
History, 19.10.2020 07:01
Mathematics, 19.10.2020 07:01
Mathematics, 19.10.2020 07:01
Mathematics, 19.10.2020 07:01