subject
Mathematics, 17.02.2020 19:34 saucyboyFredo

The Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of drilling. During the next production period, 240 hours of wiring time are available and up to 140 hours of drilling time may be used. Each air conditioner sold yields a profit of $25. Each heater assembled may be sold for a $15 profit. Formulate and solve this LP production-mix situation, and find the best combination of air conditioners and heaters that yields the highest profit.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 12:30
What is the approximate total length of iron edging needed to create the square frame and the two diagonals?
Answers: 3
question
Mathematics, 21.06.2019 21:40
Use sigma notation to represent the following series for 9 terms.
Answers: 2
question
Mathematics, 22.06.2019 00:30
Nellie is analyzing a quadratic function f(x) and a linear function g(x). will they intersect? f(x) g(x) graph of the function f of x equals one half times x squared, plus 2 x g(x) 1 5 2 10 3 15
Answers: 2
question
Mathematics, 22.06.2019 02:30
Solve the system of equations. 2x-2y=-4 and x+y=8. show work
Answers: 1
You know the right answer?
The Attaran Corporation manufactures two electrical products: portable air conditioners and portable...
Questions
question
Mathematics, 08.02.2021 02:40
question
Chemistry, 08.02.2021 02:50
question
Mathematics, 08.02.2021 02:50
question
Chemistry, 08.02.2021 02:50
Questions on the website: 13722360