Mathematics, 15.02.2020 02:27 averycipher
Base course aggregate has a target dry density of 119.7 pcf in place. It will be laid down and compacted in a rectangular street repair area of 2,000 ft. x 48 ft. x 6 in. The aggregate in the stockpile contains 3.1 percent moisture. If the required compaction is 95 percent of the target, how many tons of aggregate will be needed? Note: answer in terms of tons of both dry and moist base material assuming no loss or drying out of the aggregate onsite.
Answers: 1
Mathematics, 21.06.2019 15:30
Consider the integral: 4 0 16 − y2 − 16 − y2 4 1 x2 + y2 dz dx dy . (a) describe w. use the standard view of the x, y, and z axes. front half of a cone with a rounded top. full cone with a flat top. right half of a cone with a flat top. front half of a cone with a flat top. right half of a cone with a rounded top.
Answers: 1
Mathematics, 21.06.2019 17:00
Me! last question, and i'm stuck! write the algebraic expression that models the word phrase. the product of 2 divided by the number h and 8 more than the number k
Answers: 1
Mathematics, 21.06.2019 22:30
Find the area of the region that is inside r=3cos(theta) and outside r=2-cos(theta). sketch the curves.
Answers: 3
Base course aggregate has a target dry density of 119.7 pcf in place. It will be laid down and compa...
History, 24.11.2020 22:10
Mathematics, 24.11.2020 22:10
Mathematics, 24.11.2020 22:10
English, 24.11.2020 22:10
Health, 24.11.2020 22:10