subject
Mathematics, 11.02.2020 19:47 mariaramirez013

The cable is being used to lift a 2lb leaky bucket that is initially filled with 30 lb of water. When the bucket reaches the top of the building, it only has 5 lb of water left in it. If the cable was being pulled up at a constant rate of speed, how much work is done?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Acylinder and its dimensions are shown. which equation can be used to find v, the volume of the cylinder in cubic centimeters?
Answers: 3
question
Mathematics, 21.06.2019 20:00
The diagram shows corresponding lengths in two similar figures. find the area of the smaller figure. a. 14.4 yd2 b. 24 yd2 c. 26.4 yd2 d. 28
Answers: 1
question
Mathematics, 22.06.2019 00:00
If 7x=9y, y/z = 7/5 , then x/z = (a) 2/7 (b) 7/9 (c) 9/5 (d) 9/7 (e) 5/9
Answers: 1
question
Mathematics, 22.06.2019 01:30
5cakes cost 3.50 how much do 7 cakes cost
Answers: 2
You know the right answer?
The cable is being used to lift a 2lb leaky bucket that is initially filled with 30 lb of water. Whe...
Questions
question
History, 17.12.2019 18:31
Questions on the website: 13722359