A construction company needs to remove 4 1/4 tons of dirt from a construction site. They can remove 7/10 tons of dirt each hour. What is the total number of
hours it will take to remove the dirt?
Write your answer as a mixed number in simplest form.
Answers: 2
Mathematics, 21.06.2019 14:00
The axis of symmetry for the graph of the function f(x)=1/4^2+bx +10 is x=6. what is the value of b?
Answers: 1
Mathematics, 21.06.2019 18:30
Can someone me out here and the tell me the greatest common factor
Answers: 1
Mathematics, 21.06.2019 19:00
Graph g(x)=2cosx . use 3.14 for π . use the sine tool to graph the function. graph the function by plotting two points. the first point must be on the midline and closest to the origin. the second point must be a maximum or minimum value on the graph closest to the first point.
Answers: 1
A construction company needs to remove 4 1/4 tons of dirt from a construction site. They can remove...
Biology, 23.03.2020 23:36
Mathematics, 23.03.2020 23:36
English, 23.03.2020 23:36
English, 23.03.2020 23:37
Mathematics, 23.03.2020 23:37
Computers and Technology, 23.03.2020 23:37
Biology, 23.03.2020 23:37
Engineering, 23.03.2020 23:37
Mathematics, 23.03.2020 23:38