Mathematics, 23.12.2019 18:31 megkate
Aproject has an expected completion time of 25 days. it is given that project completion time has a standard deviation of 2.645 days. what is the probability that this project will be completed less than 21 days and 12 hours?
Answers: 3
Mathematics, 21.06.2019 19:00
Stefano accidentally dropped his sunglasses off the edge of a canyon as he was looking down. the height, h(t), in meters (as it relates to sea level), of the sunglasses after t seconds, is shown in the table. during its descent, the pair of sunglasses passed by a climber in the canyon 6 seconds after stefano dropped them. to the nearest meter, what is difference in elevation between stefano and the climber? 166 meters 176 meters 230 meters 240 meters its b.176 i took the test 166 is wrong and 176 is correct
Answers: 1
Mathematics, 21.06.2019 23:00
Find the rate at which the water is now flowing from the tap give your answer cubic centimetres per second
Answers: 1
Aproject has an expected completion time of 25 days. it is given that project completion time has a...
Physics, 06.01.2021 22:40
Business, 06.01.2021 22:40
Mathematics, 06.01.2021 22:40
Mathematics, 06.01.2021 22:40
English, 06.01.2021 22:40
English, 06.01.2021 22:40
Business, 06.01.2021 22:40
SAT, 06.01.2021 22:40
Mathematics, 06.01.2021 22:40
History, 06.01.2021 22:40
Mathematics, 06.01.2021 22:40