subject
Mathematics, 05.12.2019 01:31 stodd9503

Consider a capital budgeting example with five projects from which to select. let xi= 1 if project i is selected, 0 if not, for i = . write the appropriate constraint(s) for each condition. conditions are independent. choose the correct constraint for: if project 1 is chosen, project 5 must not be chosen.

(a) x1 + x5 < = 1

(b) x1 = x5

(c) x1 - x5 = 0

(d) x1 + x5 = 1

(e) x1 - x5 < = 0

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Find parametric equations for the line. (enter your answers as a comma-separated list of equations. let x, y, and z be functions of t.) the line in the direction of the vector 5 i + 5 j − 6k and through the point (−4, 4, −2).
Answers: 1
question
Mathematics, 21.06.2019 16:00
5× 1/2 = ? a) more than 5 because you are multiplying by a whole number b) 5/10 because you multiply the numerator and denominator by 5 c) less than 5 because you are multiplying by a number that is more than 1 d) less than 5 because you are multiplying by a number that is less than 1
Answers: 3
question
Mathematics, 21.06.2019 22:00
The figure shows the front side of a metal desk in the shape of a trapezoid. what is the area of this trapezoid? 10 ft²16 ft²32 ft²61 ft²
Answers: 2
question
Mathematics, 22.06.2019 01:10
If the probability of an event happening is 65% then the probability this event does not occur?
Answers: 1
You know the right answer?
Consider a capital budgeting example with five projects from which to select. let xi= 1 if project i...
Questions
question
Mathematics, 10.09.2019 22:30
question
Physics, 10.09.2019 22:30
question
Mathematics, 10.09.2019 22:30
Questions on the website: 13722359