subject
Mathematics, 30.11.2019 05:31 alexacarillo

A).for the following mips assembly code to be executed using the pipelined datapath, identify all of the data dependencies (which register in which instruction needs to read the result register value from which another instruction that is writing it? ) and enumerate them (give data dependencies numbers as 1,2, b).which dependencies are data hazards that will be resolved via forwarding and without a stall (you can specify the number(s) from the part a)? c).which dependencies are data hazards that will cause a stall (you can specify the number(s) from the part a)?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:20
The probability of winning something on a single play at a slot machine is 0.11. after 4 plays on the slot machine, what is the probability of winning at least once
Answers: 1
question
Mathematics, 21.06.2019 15:40
Each of the walls of a room with square dimensions has been built with two pieces of sheetrock, a smaller one and a larger one. the length of all the smaller ones is the same and is stored in the variable small. similarly, the length of all the larger ones is the same and is stored in the variable large. write a single expression whose value is the total area of this room. do not use any method invocations.
Answers: 1
question
Mathematics, 21.06.2019 22:10
Acompany manufactures three types of cabinets. it makes 110 cabinets each week. in the first week, the sum of the number of type-1 cabinets and twice the number of type-2 cabinets produced was 10 more than the number of type-3 cabinets produced. the next week, the number of type-1 cabinets produced was three times more than in the first week, no type-2 cabinets were produced, and the number of type-3 cabinets produced was the same as in the previous week.
Answers: 1
question
Mathematics, 22.06.2019 01:00
How would you find the height of points on the circle? the topic is trigonometry.
Answers: 3
You know the right answer?
A).for the following mips assembly code to be executed using the pipelined datapath, identify all of...
Questions
question
Mathematics, 28.06.2019 23:00
question
Business, 28.06.2019 23:00
Questions on the website: 13722363