subject
Mathematics, 28.11.2019 16:31 superfly903

Adoll factory needed to produce an order of dolls for a shop. the factory
planned to spend 24 days on the production at a rate of 1,500 dolls per
day. due to a technical improvement, the factory produced the dolls 1.6
times as fast as it normally would. how many days did it take the factory
to finish the order of dolls?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
If the ratio of sum of the first m and n terms of an ap is m2 : n2 , show that the ratio of its mth and nth terms is (2m βˆ’ 1) : (2n βˆ’ 1).
Answers: 1
question
Mathematics, 21.06.2019 20:00
How do you write something in scientific notation?
Answers: 2
question
Mathematics, 21.06.2019 20:00
A. what does the point (4, 122) represent? b. what is the unit rate? c. what is the cost of buying 10 tickets?
Answers: 2
question
Mathematics, 21.06.2019 23:40
For a science project, a high school research team conducted a survey of local air temperatures. based on the results of the survey, the found that the average temperatures were around 10 degrees higher than expected. this result was wrong. the trouble with the survey was that most of the locations were exposed to direct sunlight and located over asphalt or sand, which resulted in higher temperatures than normal. this is a classic example of an error in which phase of inferential statistics?
Answers: 1
You know the right answer?
Adoll factory needed to produce an order of dolls for a shop. the factory
planned to spend 24 d...
Questions
question
Health, 31.03.2021 21:20
question
Mathematics, 31.03.2021 21:20
question
Biology, 31.03.2021 21:20
Questions on the website: 13722367