Mathematics, 22.11.2019 15:31 batmandillon21

Seven people need 90 days to repair and paint a heritage building. if the job should be completed in 15 days. how many more people need to be employed.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Drag the tiles to the correct boxes to complete the pairs. match the cart-coordinates with their corresponding pairs of y-coordinates of the unit circle
Answers: 3
question
Mathematics, 21.06.2019 18:00
Identify which functions are linear or non-linear. a. f(x) = x2 + 1 b. f(x) = 2x + 5 c. f(x) = x 2 + 3 d. f(x) = 3 x + 7 e. f(x) = 4x + 10 2 - 5
Answers: 1
question
Mathematics, 21.06.2019 19:30
When 142 is added to a number the result is 64 more times the number my options are 35 37 39 41
Answers: 1
question
Mathematics, 21.06.2019 19:40
Which of the following could be the ratio of the length of the longer leg 30-60-90 triangle to the length of its hypotenuse? check all that apply. a. 313 6 b. 3: 215 c. 18: 13 d. 1: 13 e. 13: 2 of. 3: 15
Answers: 3
You know the right answer?
Seven people need 90 days to repair and paint a heritage building. if the job should be completed in...
Questions
question
Mathematics, 22.10.2020 21:01
question
Chemistry, 22.10.2020 21:01
Questions on the website: 13722363