subject
Mathematics, 19.11.2019 18:31 jasminer257

Kingsport containers company makes a single product that is subject to wide seasonal variations in demand. the company uses a job-order costing system and computes plantwide predetermined overhead rates on a quarterly basis using the number of units to be produced as the allocation base. its estimated costs, by quarter, for the coming year are given below: quarter first second third fourth direct materials $ 160,000 $ 80,000 $ 40,000 $ 120,000 direct labor 80,000 40,000 20,000 60,000 manufacturing overhead 230,000 206,000 194,000 ? total manufacturing costs (a) $ 470,000 $ 326,000 $ 254,000 $ ? number of units to be produced (b) 120,000 60,000 30,000 90,000 estimated unit product cost (a) ÷ (b) $ 3.92 $ 5.43 $ 8.47 $ ? management finds the variation in quarterly unit product costs to be confusing and difficult to work with. it has been suggested that the problem lies with manufacturing overhead because it is the largest element of total manufacturing cost. accordingly, you have been asked to find a more appropriate way of assigning manufacturing overhead cost to units of product. required: 1. assuming the estimated variable manufacturing overhead cost per unit is $0.40, what must be the estimated total fixed manufacturing overhead cost per quarter? 2. assuming the assumptions about cost behavior from the first three quarters hold constant, what is the estimated unit product cost for the fourth quarter? 3. what is causing the estimated unit product cost to fluctuate from one quarter to the next? 4. assuming the company computes one predetermined overhead rate for the year rather than computing quarterly overhead rates, calculate the unit product cost for all units produced during the year.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Cameron made 1 loaf of bread. his family ate 4/6 of the loaf of bread. how much of the loaf of bread remains? /
Answers: 2
question
Mathematics, 21.06.2019 16:40
You have 3 boxes, one "strawberries"; one "mentos" and one "mixed".but you know that all the labels are in incorrect order .how do you know witch is witch?
Answers: 1
question
Mathematics, 21.06.2019 18:40
This stem-and-leaf plot represents the heights of the students on ralph's basketball team. one student's height is missing from the plot. if the mean height of all the students on the team is 61 inches, what is the missing height? a. 55 in. b. 59 in. c. 61 in. d. 65 in.
Answers: 2
question
Mathematics, 21.06.2019 20:00
Write the point-slope form of the line passing through (2, -12) and parallel to y=3x.
Answers: 2
You know the right answer?
Kingsport containers company makes a single product that is subject to wide seasonal variations in d...
Questions
question
Mathematics, 16.09.2021 08:20
question
Mathematics, 16.09.2021 08:20
Questions on the website: 13722363