Mathematics, 11.11.2019 04:31 tmrsavage02p7cj16
All the members of a construction crew work at the same pace. six of them working together are able to pour foundation in 22 hours. how many hours would this job take if the number of workers decreased by factor of 2?
Answers: 3
Mathematics, 22.06.2019 04:00
Miguel has one foot of string. he cuts the string into fourths. how many inches is each piece of string?
Answers: 1
Mathematics, 22.06.2019 04:30
Every night nathan has to read for at least 25 minutes write and inequality that shows how long nathan can read each night
Answers: 1
Mathematics, 22.06.2019 05:00
Based on the situation in part a, the width of a rectangular garden is x feet, and its length is 5 feet more than twice its width. the right side of the equation, g(x) = 2x2 − 13x + 6, can be factored to g(x) = (2x − 1)(x − 6). this function could represent an inner region of the garden from the first equation, such as a vegetable garden with a border around it. the length of this inner garden would be 2x − 1 feet, and the width would be x − 6, which would leave a 3-foot border around the garden. part d what is the value of g(8) for the function g(x) in part c? what does this value mean in the context of the situation you described in part c?
Answers: 1
All the members of a construction crew work at the same pace. six of them working together are able...
Mathematics, 07.05.2021 21:00
Mathematics, 07.05.2021 21:00
Computers and Technology, 07.05.2021 21:00
Mathematics, 07.05.2021 21:00
Mathematics, 07.05.2021 21:00
Mathematics, 07.05.2021 21:00
Mathematics, 07.05.2021 21:00
Physics, 07.05.2021 21:00
English, 07.05.2021 21:00
Mathematics, 07.05.2021 21:00
Mathematics, 07.05.2021 21:00