subject
Mathematics, 09.11.2019 03:31 emma650

The engineer, jj, works for an electronic firm. she realizes that 4.5% of all integrated chips produced in her department are defective. she hired a consulting firm to give her advice on how to reduce the production of defective chips. the new plans were implemented. now jj wants to confirm that production of defectives had been reduced. how will she collect data and what statistical analysis she will do?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
What is the exact area of a circle with a diameter of 50 centimeters? a.87.9 square centimeters b.379.9 square centimeters c.1962.5 square centimeters d.4923.5 square centimeters
Answers: 1
question
Mathematics, 21.06.2019 15:30
Jordan rides his bike 6 7/15 miles every day to deliver newspapers and to go to and from school. if his ride to and from school is 4 3/10 miles, how many miles is the trip to deliver newspapers? 1 1/3 1 1/6 2 1/6 2 4/5
Answers: 1
question
Mathematics, 21.06.2019 17:00
One side of a rectangle is 7 feet shorter than seven times the other side. find the length of the shorter side if we also know that the perimeter of the rectangle is 306 feet.
Answers: 2
question
Mathematics, 21.06.2019 19:40
Neoli is a nurse who works each day from 8: 00 am to 4: 00 pm at the blood collection centre. she takes 45 minutes for her lunch break. on average, it takes neoli 15 minutes to collect each sample and record the patient's details. on average, how many patients can neoli see each day?
Answers: 3
You know the right answer?
The engineer, jj, works for an electronic firm. she realizes that 4.5% of all integrated chips produ...
Questions
question
Mathematics, 16.07.2019 07:30
question
Mathematics, 16.07.2019 07:30
Questions on the website: 13722362