Mathematics, 09.11.2019 02:31 NayeliNoel
11. solve the problem. a company manufactures televisions in batches of 25 and there is a 1% rate of defects. find the standard deviation for the number of defects per batch.
0.7
0.9
0.5
72.8
Answers: 2
Mathematics, 21.06.2019 22:30
Use the following statements to write a compound statement for the conjunction or disjunction. then find its truth value. p: an isosceles triangle has two congruent sides. q: a right angle measures 90° r: four points are always coplanar. s: a decagon has 12 sides. a) a right angle measures 90° or an isosceles triangle has two congruent sides; true. b) a right angle measures 90° and an isosceles triangle has two congruent sides; true. c) a right angle measures 90° and an isosceles triangle does not have two congruent sides; false. d) a right angle measures 90° or an isosceles triangle does not have two congruent sides; true.
Answers: 3
Mathematics, 21.06.2019 23:00
The sum of 5consecutive even numbers is 100. what is the first number in this sequence?
Answers: 1
Mathematics, 22.06.2019 00:00
Arectangle plot measure 20ft. by 30ft. a 3-ft.-wide sidewalk surrounds it.find the area of the sidewalk.
Answers: 1
11. solve the problem. a company manufactures televisions in batches of 25 and there is a 1% rate of...
Arts, 06.10.2019 03:00
Mathematics, 06.10.2019 03:00
Mathematics, 06.10.2019 03:00
Mathematics, 06.10.2019 03:00
French, 06.10.2019 03:00
Biology, 06.10.2019 03:00
Mathematics, 06.10.2019 03:00
History, 06.10.2019 03:00