subject
Mathematics, 08.11.2019 05:31 Nigward666

Afurniture factory has 2840 machine hours available each week in the cutting department, 3760 hours in the assembly department, and 2760 in the finishing department. manufacturing a chair requires 0.9 hour of cutting, 0.6 hour of assembly, and 0.5 hour of finishing. a cabinet requires 0.2 hour of cutting, 0.8 hour of assembly, and 0.6 hour of finishing. a buffet requires 0.4 hour of cutting, 0.5 hour of assembly, and 0.3 hour of finishing. how many chairs, cabinets, and buffets should be produced in order to use all the available production capacity?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:20
Find the image of a(4, -2) after it is reflected over the line y= 2, then reflected over the line x = 2. (-8,6) o (0.-2) o (0,6) (-8, -2)
Answers: 1
question
Mathematics, 21.06.2019 16:00
What is the measure of angle afe? 79 81 91 99
Answers: 3
question
Mathematics, 21.06.2019 17:30
Mickey needs to cut pieces of ribbon that are each 1 meter long tie onto balloons. if he has 8 pieces of ribbon that are each 1 dekameter long. how many 1 meter pieces of ribbon can he cut
Answers: 1
question
Mathematics, 21.06.2019 19:40
Neoli is a nurse who works each day from 8: 00 am to 4: 00 pm at the blood collection centre. she takes 45 minutes for her lunch break. on average, it takes neoli 15 minutes to collect each sample and record the patient's details. on average, how many patients can neoli see each day?
Answers: 3
You know the right answer?
Afurniture factory has 2840 machine hours available each week in the cutting department, 3760 hours...
Questions
question
Mathematics, 25.06.2021 01:00
question
Biology, 25.06.2021 01:00
question
History, 25.06.2021 01:00
question
Mathematics, 25.06.2021 01:00
question
Mathematics, 25.06.2021 01:00
question
Mathematics, 25.06.2021 01:00
question
SAT, 25.06.2021 01:00
question
Mathematics, 25.06.2021 01:00
Questions on the website: 13722363