subject
Mathematics, 06.11.2019 23:31 juliagearhart9p229te

Each day for two workweeks (10 days total), george weighs 4 bags from that day’s production. if the average of the means is 14 oz. and the average range is 0.4 oz., what is the lower control limit for an x-bar chart for this process?

a. 13.7084 oz.

b. 13.8768 oz.

c. 14.2916 oz.

d. 12.8000 oz.

e. 13.5908 oz.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:50
The verbal translation for the difference of m and 7 increased by 15
Answers: 3
question
Mathematics, 21.06.2019 23:30
The graph of the the function f(x) is given below. find [tex]\lim_{x \to 0\zero} f(x)[/tex] [tex]\lim_{x \to 1+\oneplus} f(x)[/tex] [tex]\lim_{x \to 0-\zeroneg} f(x)[/tex]
Answers: 1
question
Mathematics, 22.06.2019 00:20
Acircle has a radius of 12.6cm what is the exact length of an arc formed by a central angle measuring 120
Answers: 1
question
Mathematics, 22.06.2019 00:30
$5400 is? invested, part of it at 11? % and part of it at 8? %. for a certain? year, the total yield is ? $522.00. how much was invested at each? rate?
Answers: 1
You know the right answer?
Each day for two workweeks (10 days total), george weighs 4 bags from that day’s production. if the...
Questions
question
Computers and Technology, 21.11.2019 00:31
question
Physics, 21.11.2019 00:31
question
Mathematics, 21.11.2019 00:31
question
English, 21.11.2019 00:31
Questions on the website: 13722363