Mathematics, 18.10.2019 22:30 laytonlutz
Exercises problems for structural engineering 1. when estimating the live load for a new bridge design, you want that estimate to be conservative. in other words, you want to err on the safe side by basing the estimate on the worst possible scenario, such as bumper-to-bumper traffic, the heaviest vehicles, or the worst environmental conditions. with this in mind, estimate the live load for the following proposed bridge designs.
a. a foot bridge with a 174. ft span and two separate 4. ft wide lanes to allow for pedestrian traffic in both directions.
b. a four-lane highway bridge with a 300. ft span.
Answers: 1
Mathematics, 21.06.2019 16:00
Select all the correct answers. what is 221,000,000,000,000,000,000 expressed in scientific notation?
Answers: 2
Mathematics, 21.06.2019 19:30
If the ratio of sum of the first m and n terms of an ap is m2 : n2 , show that the ratio of its mth and nth terms is (2m − 1) : (2n − 1).
Answers: 3
Mathematics, 21.06.2019 21:30
Amira is painting a rectangular banner 2 1/4 yards wide. the banner will have a blue background. amira has enough paint to cover 1 1/2 square yards of the wall. the school colors are blue and yellow, so amira wants to add yellow rectangles on the left and right sides of the blue rectangle. the yellow rectangles will each be 3/4 yards wide and the same height as the blue rectangle. what will be the total area of the two yellow rectangles?
Answers: 3
Mathematics, 22.06.2019 00:00
If 7x=9y, y/z = 7/5 , then x/z = (a) 2/7 (b) 7/9 (c) 9/5 (d) 9/7 (e) 5/9
Answers: 1
Exercises problems for structural engineering 1. when estimating the live load for a new bridge desi...
English, 29.10.2020 03:50
Mathematics, 29.10.2020 03:50
Mathematics, 29.10.2020 03:50
English, 29.10.2020 03:50
Mathematics, 29.10.2020 03:50
Mathematics, 29.10.2020 03:50
Mathematics, 29.10.2020 03:50
Mathematics, 29.10.2020 03:50
Geography, 29.10.2020 03:50