subject
Mathematics, 08.10.2019 00:10 Ashley606hernandez

You have been told to continue monitoring the resistance of an electronic component with the existing shewhart control charting scheme using the sampling method used by the person on the previous shift. you see in a log that for the samples he collected, r was 0.525 ohms, and the estimate of σx that he determined from his data was 0.207 ohms. there is, however, no record of the sample size he used. based on the information available to you, what sample size do you use to continue testing in the same manner

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
How many days was the temperature above 90 degrees?
Answers: 3
question
Mathematics, 21.06.2019 19:30
Asurvey of 45 teens found that they spent an average of 25.6 hours per week in front of a screen (television, computer, tablet, phone, based on the survey’s sample mean, which value could be the population mean? 2.3 hours 27.4 hours 75.3 hours 41.5 hours
Answers: 1
question
Mathematics, 21.06.2019 20:40
Answer pls man im trying to get out of summer school
Answers: 1
question
Mathematics, 21.06.2019 22:20
Question 9 of 10 2 points suppose your sat score is 1770. you look up the average sat scores for students admitted to your preferred colleges and find the list of scores below. based on your sat score of 1770, which average score below represents the college that would be your best option? o a. 1790 o b. 2130 o c. 2210 od. 1350
Answers: 3
You know the right answer?
You have been told to continue monitoring the resistance of an electronic component with the existin...
Questions
question
Mathematics, 23.03.2021 21:30
question
Mathematics, 23.03.2021 21:30
question
Mathematics, 23.03.2021 21:30
Questions on the website: 13722360