subject
Mathematics, 14.09.2019 06:20 jermiahj55

Aconcrete batching plan of xyz company could produce 2 type of concrete namely, type a and type b. the cost to produce each m3 of concrete type a and b are rm 20.00 and rm 13.00 respectively. the materials require of each type of concrete is shown in table 2 table 2 materials requirement concrete type a concrete type b availability (m'/week) 1200 1800 aggregate cement water 20 10 100 20 100 a) construct objective and constraint functions of this linear programming b) determine the maximum cost production for both type of concrete c) if the aggregate for concrete type b change 10 m3 would it effect the total cost production for both concrete type a and b? justify your answer.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Using two or more complete sentences, describe how you can find a vector parallel to b=-2,3
Answers: 2
question
Mathematics, 21.06.2019 19:00
Jack did 3/5 of all problems on his weekend homework before sunday. on sunday he solved 1/3 of what was left and the last 4 problems. how many problems were assigned for the weekend?
Answers: 1
question
Mathematics, 21.06.2019 19:30
Aregular pentagon with a perimeter of 21 inches is dilated by a scale factor of 5/3 to create a new pentagon. what is the perimeter of the new pentagon?
Answers: 2
question
Mathematics, 21.06.2019 20:00
Given the equation y − 4 = three fourths(x + 8) in point-slope form, identify the equation of the same line in standard form. −three fourthsx + y = 10 3x − 4y = −40 y = three fourthsx + 12 y = three fourthsx + 10
Answers: 1
You know the right answer?
Aconcrete batching plan of xyz company could produce 2 type of concrete namely, type a and type b. t...
Questions
question
Mathematics, 28.09.2019 21:00
question
Biology, 28.09.2019 21:00
question
Mathematics, 28.09.2019 21:00
Questions on the website: 13722367