subject
Mathematics, 09.09.2019 22:20 eskarletche8

Problem-solving in an engineering factory, the production line takes up of the
floor area.
out of the remaining floor area, a total of is taken up by office space and the canteen
the rest is warehouse space.
the warehouse space occupies 2000 m².
work out the floor area of the production line.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Me! last question, and i'm stuck! write the algebraic expression that models the word phrase. the product of 2 divided by the number h and 8 more than the number k
Answers: 1
question
Mathematics, 21.06.2019 18:00
Find the number of real number solutions for the equation. x2 + 5x + 7 = 0 0 cannot be determined 1 2
Answers: 2
question
Mathematics, 21.06.2019 18:30
What describes horizontal cross section of the right rectangle 6m 8m 5m
Answers: 1
question
Mathematics, 21.06.2019 21:30
High school seniors with strong academic records apply to the nation’s most selective colleges in greater numbers each year. because the number of slots remains relatively stable, some colleges reject more early applicants. suppose that for a recent admissions class, an ivy league college received 2851 applications for early admission. of this group, it admitted 1033 students early, rejected 854 outright, and deferred 964 to the regular admission pool for further consideration. in the past, this school has admitted 18% of the deferred early admission applicants during the regular admission process. counting the students admitted early and the students admitted during the regular admission process, the total class size was 2375. let e, r, and d represent the events that a student who applies for early admission is admitted early, rejected outright, or deferred to the regular admissions pool.suppose a student applies for early admission. what is the probability that the student will be admitted for early admission or be deferred and later admitted during the regular admission process?
Answers: 3
You know the right answer?
Problem-solving in an engineering factory, the production line takes up of the
floor area.
Questions
question
Computers and Technology, 08.10.2019 21:30
question
Biology, 08.10.2019 21:30
question
Social Studies, 08.10.2019 21:30
Questions on the website: 13722363