subject
Mathematics, 03.09.2019 04:10 elijahbravo4334

Starting at home, ishaan traveled uphill to the gift store for
1
8
1818 minutes at just
1
0
1010 mph. he then traveled back home along the same path downhill at a speed of
3
0
3030 mph.
what is his average speed for the entire trip from home to the gift store and back?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
The blue whale is the largest animal living on the earth. the average blue whale measures 100 feet long (30 meters) and weighs 300,000 pounds (136,000 kilograms). a whale’s head is 1⁄3 of the length of its body. a new baby whale is 1⁄4 the length of a grown whale. the average man is 1⁄17 the length of a blue whale, and 1⁄1,818 its weight. a human baby measures 1⁄4 of the length of an adult. calculate the following information: how long is a whale’s head? how long is a new baby whale? how tall is the average man? how much does the average man weigh? how tall is the average human baby?
Answers: 3
question
Mathematics, 21.06.2019 18:10
Abc will undergo two transformations to give aa'b'c' which pair of transformations will give a different image of aabc if the order of the transformations is reversed? a. a rotation 90' counterclockwise about the origin followed by a reflection across the y-axis b a translation 5 units down followed by a translation 4 units to the right c. a reflection across the x-axis followed by a reflection across the y-axis a rotation 180'clockwise about the ongin followed by a reflection across the y-axis reset next 2 omentum all rights reserved o atk me anything o o e
Answers: 1
question
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
question
Mathematics, 22.06.2019 00:30
What line represents the relationship between r and s
Answers: 1
You know the right answer?
Starting at home, ishaan traveled uphill to the gift store for
1
8
1818 minutes a...
Questions
question
History, 14.12.2019 05:31
question
Advanced Placement (AP), 14.12.2019 05:31
Questions on the website: 13722360