subject
Mathematics, 18.08.2019 01:10 jadajordan1010

Aconstruction project has four separate components that must be completed in order. the expected values and standard deviations of the completion times of the activities are listed below. assuming that the four activities are independent, determine the expected value and standard deviation of the completion time of the project

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
Me, prove a quadrilateral with vertices g(1,-1), h(5,1), i(4,3) and j(0,1) is a rectangle using the parallelogram method and a rectangle method.
Answers: 3
question
Mathematics, 22.06.2019 06:30
Asequence of transformations maps aabc to aa'bc. the sequence of transformations that maps abc to aa'b'c' is a reflection across the followed by a translation
Answers: 2
question
Mathematics, 22.06.2019 07:20
Which of the following illustrates the product rule for logarithmic equations? a. log2(4x)=log24/log2x b. log2(4x)=log24xlog2x c. log2(4x)=log24-log2x d. log2(4x)=log24+log2x
Answers: 2
question
Mathematics, 22.06.2019 07:40
Suppose a batch of steel rods produced at a steel plant have a mean length of 150 millimeters, and a standard deviation of 12. if 100 rods are sampled at random from the batch, what is the probability that the mean length of the sample rods would differ from the population mean by less than 0.5 millimeters?
Answers: 1
You know the right answer?
Aconstruction project has four separate components that must be completed in order. the expected val...
Questions
question
Mathematics, 12.11.2020 20:10
question
Computers and Technology, 12.11.2020 20:10
Questions on the website: 13722367