subject
Mathematics, 17.08.2019 17:20 hgfddfg

2) an engineer is trying to formulate the minimum cost set of materials to use in an upcoming project. there are four groups of materials, and exactly one item from each group must be selected. the costs are given below: group a cost group b cost group c cost group d cost a1 10 b1 2 c1 8 d1 5 a2 12 b2 1 c2 9 d2 8 a3 16 c3 11 d3 9 c4 13 if b2 is selected, then a3 must be used. we can use at most one of a1, b1, c1, and d1, while we must have at least two of a3, c3, c4, and d3. finally, d1 cannot be used unless a2 or c4 is used. formulate and solve a 0-1 integer programming model that will determine the optimal solution.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:50
Need to increase the numbers of customers i talk to daily by 20% how many customers do i need to talk to if i talk to a average of 8 customers per hour during an 8 hour shift
Answers: 2
question
Mathematics, 21.06.2019 16:30
Jackie purchased 3 bottles of water and 2 cups of coffee for a family for $7.35. brian bought 4 bottles of water and 1 cup of coffee for his family for $7.15. how much does each bottle of water cost? how much does each cup of coffee cost? i need this done
Answers: 3
question
Mathematics, 21.06.2019 17:00
The table below shows the height of a ball  x  seconds after being kicked.  what values, rounded to the nearest whole number, complete the quadratic regression equation that models the data? f(x)  =  x2  +  x  +  0based on the regression equation and rounded to the nearest whole number, what is the estimated height after 0.25 seconds?   feet
Answers: 2
question
Mathematics, 21.06.2019 19:10
Labc is reflected across x = 1 and y = -3. what are the coordinates of the reflection image of a after both reflections?
Answers: 3
You know the right answer?
2) an engineer is trying to formulate the minimum cost set of materials to use in an upcoming projec...
Questions
question
Geography, 14.10.2019 07:00
Questions on the website: 13722360