3guys can do a job in 12 hours. if those same guys work for 4 hours, and then a new guy joins every hour after that how fast can they finish the job.
how does one solve this problem? and how does one find the rate to use for this problem?
you!
Answers: 1
Mathematics, 21.06.2019 14:30
Aparking lot is to be 400 feet wide and 370 feet deep. how many standard-sized cars fit in this lot considering a double-loaded (w4) two way traffic set up, an angle of 90° and a sw of 9’ 0’’? (do not consider handicapped parking spaces, and consider 15’ for turning aisles). show your work.
Answers: 2
Mathematics, 21.06.2019 17:30
Write an expression that has three terms and simplifies to 4x - 7. identify the coefficient(s) and constant(s) in your expression
Answers: 1
Mathematics, 21.06.2019 19:00
Daniel expanded the expression as shown below -2(-8x-4y+3/4)=-10x-8y-11/4 what errors did he make? check all that apply
Answers: 3
Mathematics, 21.06.2019 19:00
The probability that you roll a two on a six-sided die is 1 6 16 . if you roll the die 60 times, how many twos can you expect to roll
Answers: 1
3guys can do a job in 12 hours. if those same guys work for 4 hours, and then a new guy joins every...
History, 26.02.2020 04:17
Health, 26.02.2020 04:17