subject
Mathematics, 27.07.2019 04:10 Bearboy1564

Amanufacturer of downhill and cross-country skis reports that manufacturing time is 1 hours and 2 hours, respectively, per ski and that finishing time is 2 hours for each downhill and 1 hours for each cross-crountry ski. there are only 6 hours per week available for the manufacturing process and 6 hours for the finishing process. the average profit is $78 for downhill ski and $89 for cross-country ski. the manufacturer wants to know how many of each type of ski should be made to maximize the weekly profit.
corner points of the feasible region:
if there is more than one corner point, type the points separated by a comma
maximum profit is: $
when downhill skis
and cross country skis are produced.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
896.31 cm= km 100cm = 1m 1000m = 1km a) 0.0089631 b) 0.0089631 c) 8.9631 d) 89.631
Answers: 2
question
Mathematics, 21.06.2019 18:00
The sat and act tests use very different grading scales. the sat math scores follow a normal distribution with mean 518 and standard deviation of 118. the act math scores follow a normal distribution with mean 20.7 and standard deviation of 5. suppose regan scores a 754 on the math portion of the sat. how much would her sister veronica need to score on the math portion of the act to meet or beat regan's score?
Answers: 1
question
Mathematics, 21.06.2019 20:00
Afamily has five members. a mom, a dad, two sisters, & a brother. the family lines up single file. what is the probabillity that the mom is at the front of the line
Answers: 1
question
Mathematics, 21.06.2019 23:30
Answer each of the questions for the following diagram: 1. what type of angles are these? 2. solve for x. what does x equal? 3. what is the measure of the angles?
Answers: 1
You know the right answer?
Amanufacturer of downhill and cross-country skis reports that manufacturing time is 1 hours and 2 ho...
Questions
question
Mathematics, 07.04.2020 23:23
Questions on the website: 13722361