subject
Mathematics, 27.07.2019 00:10 madiburnss

Agroup of students volunteered to finish a construction work in 25 days .1q of students did not come n total work could b finished in 35 days .the original number of students in group

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Determine the fraction of total interest owed. after the fourth month of a 12-month loan: the numerator is: {(n + ) + (n + ) + (n + ) + (n + )} = , and the denominator is: {(n) + (n + 1) + + (n + )} = . therefore, the fraction is numerator/denominator (to the nearest tenth) =
Answers: 1
question
Mathematics, 21.06.2019 21:00
Suppose a gym membership has an initial enrollment fee of $75 and then a fee of $29 a month. which equation models the cost, c, of the gym membership for m months?
Answers: 1
question
Mathematics, 21.06.2019 22:00
(01.04 lc)multiply 1 over 6 multiplied by negative 1 over 2. negative 1 over 3 negative 1 over 12 1 over 12 1 over 3
Answers: 1
question
Mathematics, 22.06.2019 02:30
Aconstruction worker needs to put a rectangular window in the side of a building he knows from measuring that the top and bottom of the window have a width of 8bfeet and the sides have a length of 15 feet he also measured one diagonal to be 17 feet what is the length of the other diagonal
Answers: 1
You know the right answer?
Agroup of students volunteered to finish a construction work in 25 days .1q of students did not come...
Questions
question
Mathematics, 14.03.2020 01:52
question
Business, 14.03.2020 01:52
Questions on the website: 13722360