subject
Mathematics, 20.07.2019 03:20 amay1977

The world brand of rivet placement is 11209 rivets in 9 hours and belongs to j. mair of ireland. if another person places 11209 rivets in 10 hours, how long will it take both of them, if they work together, to place the 11209 rivets?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:20
Apolynomial function has a root of –6 with multiplicity 1, a root of –2 with multiplicity 3, a root of 0 with multiplicity 2, and a root of 4 with multiplicity 3. if the function has a positive leading coefficient and is of odd degree, which statement about the graph is true?
Answers: 2
question
Mathematics, 21.06.2019 19:00
Amodel rocket is launched from a roof into a large field. the path of the rocket can be modeled by the equation y = -0.04x^2 + 8.6x + 4.8, where x is the horizontal distance, in meters, from the starting point on the roof and y is the height, in meters, of the rocket above the ground. how far horizontally from its starting point will the rocket land? a. 0.56 m b. 215.56 m c. 431.11 m d. 215.74 m
Answers: 1
question
Mathematics, 21.06.2019 20:10
Acolony contains 1500 bacteria. the population increases at a rate of 115% each hour. if x represents the number of hours elapsed, which function represents the scenario? f(x) = 1500(1.15)" f(x) = 1500(115) f(x) = 1500(2.15) f(x) = 1500(215)
Answers: 3
question
Mathematics, 21.06.2019 22:00
In δabc, m∠acb = 90°, cd ⊥ ab and m∠acd = 45°. find: a find cd, if bc = 3 in
Answers: 1
You know the right answer?
The world brand of rivet placement is 11209 rivets in 9 hours and belongs to j. mair of ireland. if...
Questions
question
Mathematics, 13.04.2021 01:00
question
Chemistry, 13.04.2021 01:00
Questions on the website: 13722367