subject
Mathematics, 27.06.2019 03:30 morkitus13

Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? the standard normal equation can be applied as follows: z = startfraction left parenthesis due date minus expected date of completion right parenthesis over sigma subscript p endfraction , where z is the number of standard deviations the due date or target date lies from the mean or expected date and sigma subscript p is the project standard deviation, which is the square root of the variance. for the due date of 17 months, value of z based on the given information = negative 2.000 (round your response to two decimal places). using the standard normal table , the probability that the project will be completed in 17 months = nothing (round your response to four decimal places).

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Scarlet bought three pairs of sunglasses and two shirts for $81 and paula bought one pair of sunglasses and five shirts for $105 what is the cost of one pair of sunglasses and one shirt?
Answers: 2
question
Mathematics, 21.06.2019 17:30
1. if we have 3 babies what is the probability they’re going to be all boys? 2. if we roll 2 die at the same time what is the probability of getting less than 10 on the first roll and a 5 on the second roll 3. if we have 3 babies what is the probability their is going to be 2 girls? 4. if we have 3 babies what is the probability of having no more than 1 girl? 5. it we have 3 babies and then have another 3 babies what is the probability of us having at least 1 boy and then having all girls?
Answers: 1
question
Mathematics, 21.06.2019 20:00
How long does it take natsumi to clean up after she is done? table: .area time30. 245. 2.7560. 3.5
Answers: 2
question
Mathematics, 21.06.2019 22:50
Ur environment is very sensitive to the amount of ozone in the upper atmosphere. the level of ozone normally found is 4.04.0 parts/million (ppm). a researcher believes that the current ozone level is not at a normal level. the mean of 2525 samples is 4.44.4 ppm with a standard deviation of 0.80.8. assume the population is normally distributed. a level of significance of 0.020.02 will be used. make the decision to reject or fail to reject the null hypothesis. answer tables
Answers: 3
You know the right answer?
Using pert, adam munson was able to determine that the expected project completion time for the cons...
Questions
Questions on the website: 13722363