chance has hired a construction crew to renovate his kitchen. they charge $3.12 per square foot for materials and $120.30 per day of labor. chance spent $2,907.96 on the renovation. if the number of square feet is 220 more than the number of days it took for the renovation, how long did the renovation take?
a. 3 days
b. 16 days
c. 18 days
d. 21 days

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
What is the solution to the equation in the & show work i’m very
Answers: 1
question
Mathematics, 21.06.2019 19:30
Me max recorded the heights of 500 male humans. he found that the heights were normally distributed around a mean of 177 centimeters. which statements about max’s data must be true? a) the median of max’s data is 250 b) more than half of the data points max recorded were 177 centimeters. c) a data point chosen at random is as likely to be above the mean as it is to be below the mean. d) every height within three standard deviations of the mean is equally likely to be chosen if a data point is selected at random.
Answers: 2
question
Mathematics, 21.06.2019 20:30
What is 140% of 25? because i need
Answers: 2
question
Mathematics, 21.06.2019 21:00
The perimeter of a rectangle is 42 inches. if the width of the rectangle is 6 inches, what is the length
Answers: 2
You know the right answer?
Extra points so confused
chance has hired a construction crew to renovate his kitchen. they...
Questions
question
English, 22.03.2021 20:10
question
Chemistry, 22.03.2021 20:10
question
Mathematics, 22.03.2021 20:10
question
Mathematics, 22.03.2021 20:10
Questions on the website: 13722360