subject
Mathematics, 29.01.2020 21:46 cnolasco3675

Asteel factory typically produces 4.4 tons of steel every eight days. but in the past eight days, production has dropped by 1.2 tons. what is the average rate of change in steel production over the past eight days? express the answer in tons per day.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
Acompany manufactures large valves, packed in boxes. a shipment consists of 1500 valves packed in 75 boxes. each box has the outer dimensions 1.2 x 0.8 x 1.6 m and the inner dimensions 1.19 x 0.79 x 1.59 m. the boxes are loaded on a vehicle (truck + trailer). the available capacity in the vehicle combination is 140 m3. each valve has a volume of 0.06 m3. - calculate the load factor on the box level (%). - calculate the load factor on the vehicle level (%). - calculate the overall load factor (%).
Answers: 1
question
Mathematics, 22.06.2019 01:00
Mia’s gross pay is 2953 her deductions total 724.15 what percent if her gross pay is take-home pay
Answers: 2
question
Mathematics, 22.06.2019 03:10
Each side length of the hexagons is 1, what’s the area of abc
Answers: 1
question
Mathematics, 22.06.2019 03:30
Sate why the measure of angle d is 120 degrees
Answers: 2
You know the right answer?
Asteel factory typically produces 4.4 tons of steel every eight days. but in the past eight days, pr...
Questions
question
Mathematics, 24.01.2021 02:40
question
Chemistry, 24.01.2021 02:40
question
Mathematics, 24.01.2021 02:40
Questions on the website: 13722366