a small manufacturing plant makes three types of inflatabl boats: one-person, two-person, and 4 person models. each boa requires the services of three departments as listed in the tabble. the cutting, assemply, and packaging depepartments have available a masimum of 380,330, and 120 labor-hours per week respectively.
table

collumns are one person, 2 person, 4 person respectivly
rows
cutting 0.5hours 1hour 1.5hour
assembly 0.6hours 0.9hour 1.2hour
packaging 0.2hour 0.3hour 0.5hour

a. how many boats of each type ust be produced each week for the plant to operate at full capacity?
b. how is the production schedule in part a affected if the packaging department is no longer used?
c. how is the production schedule in part a affected if the 4 person boat is no longer produced?
(use gauss-jordan elimination when possible and show all work and reasoning)

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
What is the relationship between all triangles that can be drawn given the same three angles
Answers: 2
question
Mathematics, 21.06.2019 19:00
Rob spent 25%, percent more time on his research project than he had planned. he spent an extra h hours on the project. which of the following expressions could represent the number of hours rob actually spent on the project? two answers
Answers: 3
question
Mathematics, 21.06.2019 21:30
Madeline takes her family on a boat ride. going through york canal, she drives 6 miles in 10 minutes. later on as she crosses stover lake, she drives 30 minutes at the same average speed. which statement about the distances is true?
Answers: 3
question
Mathematics, 22.06.2019 00:00
Write the equation in general quadratic form: plz !
Answers: 1
You know the right answer?
From my homework

a small manufacturing plant makes three types of inflatabl boats: one-...
Questions
question
Mathematics, 27.07.2019 07:00
Questions on the website: 13722367