All the members of a construction crew work at the same pace. four of them working together are able to pour concrete foundations in 32 hours. how many hours would this job take if the number of workers: increased 2 times increased 4 times

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
Complete the solution of the equation. find the value of y when x equals to 1 9x-5y=29
Answers: 2
question
Mathematics, 21.06.2019 22:30
Will mark determine whether the conjecture is true or false. give a counterexample for any false conjecture. given: points r, s, and t conjecture: r, s, and t are coplanar. a) false; the points do not have to be in a straight line. b) true c) false; the points to not have to form right angles. d) false; one point may not be between the other two.
Answers: 1
question
Mathematics, 22.06.2019 01:00
First work with stencil one. use a combination of reflections, rotations, and translations to see whether stencil one will overlap with the original pattern. list the sequence of rigid transformations you used in your attempt, noting the type of transformation, the direction, the coordinates, and the displacement in
Answers: 3
question
Mathematics, 22.06.2019 02:30
An engineer is going to redesign an ejection seat for an airplane. the seat was designed for pilots weighing between 120 lb and 161 lb. the new population of pilots has normally distributed weights with a mean of 125 lb and a standard deviation of 28.1 lb. a)if a pilot is randomly selected, find the probability that his weight is between 120 lb and 161 lb.the probability is approximately? b. if 36 different pilots are randomly selected, find the probability that their mean weight is between 120 lb and 161 lb. the probability is approximately? c. when redesigning the ejection seat, which probability is more relevant? . part (b) because the seat performance for a single pilot is more important. b. part (b) because the seat performance for a sample of pilots is more important. c. part (a) because the seat performance for a sample of pilots is more important. d. part (a) because the seat performance for a single pilot is more important.
Answers: 3
You know the right answer?
All the members of a construction crew work at the same pace. four of them working together are able...
Questions
question
English, 21.12.2019 00:31
question
Mathematics, 21.12.2019 00:31
Questions on the website: 13722361