subject
Mathematics, 30.06.2019 02:00 briarkaltvedt

It cost a contractor $13,750 to manufacture their first unit. the company expects to experience a 93% unit learning curve. estimate the cost of the 14th unit. (round intermediate calculations to 4 decimal places)

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 21:30
Plz ( true - false) all triangles have interior angles whose measure sum to 90.
Answers: 2
question
Mathematics, 21.06.2019 23:20
Interpret the following expression (5y^2-7)^3/(2y)^2
Answers: 2
question
Mathematics, 22.06.2019 01:10
Awavelength of 610 nm was found to be the most intense wavelength emitted by copper. answer the following questions about this wavelength of light. a) what is this wavelength in cm? b) what is the frequency that corresponds to this wavelength? c) what is the energy of light of this wavelength? d) what is the wavenumber corresponding to this wavelength?
Answers: 2
question
Mathematics, 22.06.2019 02:30
The distribution of a sample of the outside diameters of pvc pipes approximates a symmetrical, bell-shaped distribution. the arithmetic mean is 14.0 inches, and the standard deviation is 0.1 inches. about 68% of the outside diameters lie between what two amounts?
Answers: 1
You know the right answer?
It cost a contractor $13,750 to manufacture their first unit. the company expects to experience a 93...
Questions
question
Mathematics, 23.11.2019 07:31
question
English, 23.11.2019 07:31
Questions on the website: 13722363