Answers: 3
Mathematics, 21.06.2019 17:30
The swimming pool is open when the high temperature is higher than 20∘c. lainey tried to swim on monday and thursday (which was 33 days later). the pool was open on monday, but it was closed on thursday. the high temperature was 30 ∘c on monday, but decreased at a constant rate in the next 33 days. write an inequality to determine the rate of temperature decrease in degrees celsius per day, d, from monday to thursday.
Answers: 3
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 22.06.2019 00:00
At noon a tank contained 10cm water. after several hours it contained 7cm of water. what is the percent decrease of water in the tank?
Answers: 1
What two number multiply to equal 28 but add up to equal 13?...
Mathematics, 01.01.2020 05:31
English, 01.01.2020 05:31
Mathematics, 01.01.2020 05:31
Computers and Technology, 01.01.2020 05:31
Health, 01.01.2020 05:31
Social Studies, 01.01.2020 05:31
History, 01.01.2020 05:31
History, 01.01.2020 05:31
Mathematics, 01.01.2020 05:31
Mathematics, 01.01.2020 05:31
English, 01.01.2020 05:31
Health, 01.01.2020 05:31