In a factory, a certain machine needs 10 min to warm up. it takes 15 min for the machine to run a cycle. the machine can operate for as long as 6 h per day including warm up time. draw a graph showing the total time the machine operates during 1 day as a function of the number of cycles it runs. -what domain and range are reasonable? -is the function a linear function?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 21:00
Suppose a gym membership has an initial enrollment fee of $75 and then a fee of $29 a month. which equation models the cost, c, of the gym membership for m months?
Answers: 1
question
Mathematics, 21.06.2019 23:00
Someone answer this asap for gabriella uses the current exchange rate to write the function, h(x), where x is the number of u.s. dollars and h(x) is the number of euros, the european union currency. she checks the rate and finds that h(100) = 7.5. which statement best describes what h(100) = 75 signifies? a. gabriella averages 7.5 u.s. dollars for every 100 euros. b. gabriella averages 100 u.s. dollars for every 25 euros. c. gabriella can exchange 75 u.s. dollars for 100 euros. d. gabriella can exchange 100 u.s. dollars for 75 euros.
Answers: 1
question
Mathematics, 22.06.2019 01:00
Three consecutive integers have a sum of 234. what are the three integers
Answers: 2
question
Mathematics, 22.06.2019 02:00
If p(x) is the total value of the production when there are x workers in a plant, then the average productivity of the workforce at the plant is a(x) = p(x) x . (a) find a'(x). a'(x) = xp'(x) βˆ’ p(x) x a'(x) = xp'(x) βˆ’ p(x) x2 a'(x) = p'(x) βˆ’ p(x) x a'(x) = xp'(x) βˆ’ p'(x) x2 a'(x) = p'(x) βˆ’ xp(x) x2 why does the company want to hire more workers if a'(x) > 0? a'(x) > 0 β‡’ a(x) is ; that is, the average productivity as the size of the workforce increases. (b) if p'(x) is greater than the average productivity, which of the following must be true? p'(x) βˆ’ xp(x) > 0 p'(x) βˆ’ xp(x) < 0 xp'(x) βˆ’ p'(x) > 0 xp'(x) βˆ’ p(x) < 0 xp'(x) βˆ’ p(x) > 0
Answers: 2
You know the right answer?
In a factory, a certain machine needs 10 min to warm up. it takes 15 min for the machine to run a cy...
Questions
question
Mathematics, 05.01.2021 23:10
question
Mathematics, 05.01.2021 23:10
question
Mathematics, 05.01.2021 23:10
question
Mathematics, 05.01.2021 23:10
question
Mathematics, 05.01.2021 23:10
Questions on the website: 13722362