subject
Mathematics, 10.07.2019 05:00 MrKrinkle77

You are biking at a speed of 18 miles per hour, you are 3 miles behind you friend who is biking at speed of 12 miles an hour. write and solve an equation to find how long it takes you to for you to catch up to your friend.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 12:50
Nnnnneeedd 1.find the residual if you know the actual number is 5.2 and the predicted value is 4.8
Answers: 3
question
Mathematics, 21.06.2019 14:30
Match the following terms with their definitions. 1. bisector of a segment ray ba and ray bc are opposite rays if a, b, and c are collinear and b (the endpoint of both rays) is between a and c. 2. opposite rays a ray, , is the set of points beginning at point a and going infinitely in the direction of point b. 3. collinear points a line or segment that intersects the segment at its midpoint. 4. betweenness of points a set of two or more points all on the same line. 5. ray the distance between the endpoints of a segment. 6. space point b is between a and c if a, b, and c are collinear and the equation ab + bc = ac is true, where ab, bc, and ac are the distances between points a and b, b and c, and a and c, respectively. 7. midpoint of a segment a set of two or more points all on the same plane. 8. coplanar points the point on a segment that divides the segment into two equal segments. 9. length of a segment the set of all possible points. 10. line segment the set of two different endpoints and all points between them.
Answers: 1
question
Mathematics, 21.06.2019 15:30
Suppose you want just guess at the answers in a 5 question multiple-choice test. each question has 3 responses and only one is correct. what is the probability of getting two questions right just guessing? 20 points 0.3275 0.2753 0.7532 none of the above
Answers: 3
question
Mathematics, 21.06.2019 15:30
The average hourly earnings for a construction worker is projected to be $24.50 in 2012. jason wants to join the construction work force after he graduates in 2012. his friend tells him that average hourly earnings for construction workers will rise by 2% from 2009 to 2012. based on the data below, assuming that the projected hourly earnings are correct, is jason’s friend’s statement accurate? construction industry - average hourly earnings, 2000-2009 a. his friend’s statement is accurate. the average hourly earnings will increase by 2%. b. his friend’s statement is not accurate. the percent increase will be more than 2% c. his friend’s statement is not accurate. the percent increase will be less than 2% d. his friend’s statement is not accurate. the average hourly earnings will decrease
Answers: 3
You know the right answer?
You are biking at a speed of 18 miles per hour, you are 3 miles behind you friend who is biking at s...
Questions
question
Mathematics, 31.03.2020 04:24
Questions on the website: 13722361