subject
Mathematics, 11.07.2019 11:30 zoet1027

Aconstruction company needs to remove 10 tons of dirt from a construction site. they can remove 2/5 tons of dirt each hour. how long will it take to remove the dirt.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Is trapezoid abdc the result of a dilation of trapezoid mnpq by a scale factor of ? why or why not? yes, because ab and cd are each the lengths mn and qp. yes, because sides ab and cd are parallel to sides mn and qp. no, because ab is the length mn but cd is the length qp. no, because sides ab and cd have different slopes from sides mn and qp.
Answers: 1
question
Mathematics, 21.06.2019 19:30
Nikolas calculated the volume of the prism. his work is shown below.
Answers: 1
question
Mathematics, 21.06.2019 19:30
Order the measurements from the least to the greatest. 2,720 ml , 24.91 l , 0.0268 kl
Answers: 1
question
Mathematics, 21.06.2019 21:50
If you double the input of a function and it results in half the output, and if you triple the input and it results in a third of the output, what can be guessed about the function? check all that apply.
Answers: 3
You know the right answer?
Aconstruction company needs to remove 10 tons of dirt from a construction site. they can remove 2/5...
Questions
question
Mathematics, 28.07.2019 09:10
question
Mathematics, 28.07.2019 09:10
Questions on the website: 13722367