subject
Health, 07.05.2020 06:04 idk9329

The average number of transcribed lines per month at Bent Tree Hospital is 142,500. The daily production standard is 950 lines per day. With 20 workdays in the month, calculate the minimum number of FTEs needed for this volume.

A. 13B. 8C. 6D. 7.5

ansver
Answers: 3

Another question on Health

question
Health, 22.06.2019 22:50
What is one technique to a person get proper sleep? eat a heavy meal before bed. exercise intensely before bed. practice relaxation breathing before bed. use electronics before bed.
Answers: 1
question
Health, 23.06.2019 16:30
15. there has been growing public concern regarding the ethical conduct of healthcare professionals. think of a time where you, someone you know, read about or seen on television was in a healthcare facility in a difficult situation and there was poor ethical conduct amongst the healthcare professional(s) where the patient had to pursue litigation. as a healthcare manager, what actions would you take to prevent or resolve ethical dilemmas encountered by healthcare professionals?
Answers: 3
question
Health, 24.06.2019 01:00
Which describes a side effect? a. an unwanted physical or mental effect caused by a drug b. developing a chemical need for a drug c. the need for increasingly larger amounts of the drug d. the body’s reaction to not having the drug
Answers: 2
question
Health, 24.06.2019 16:40
How to get over depression i' mean there's gotta way right me !
Answers: 2
You know the right answer?
The average number of transcribed lines per month at Bent Tree Hospital is 142,500. The daily produc...
Questions
question
History, 30.08.2019 01:10
Questions on the website: 13722362