3. a field is a combination-drive reservoir. the current reservoir pressure is estimated at 2500 psi. the reservoir production data and pvt information are given below:
initial reservoir condition
current reservoir condition
p, psi
3000
2500
bo, bbl/stb
1.35
1.33
rs, scf/stb
600
500
np, mmstb
0
5
gp, mmmscf
5.5
bw, bbl/stb
1.00
1.00
we, mmbbl
0
3
wp, mmbbl
0
0.2
bg, bbl/scf
0.0011
0.0015
cf, cw
0
0
the following additional information is available:
volume of bulk oil zone = 100,000 ac-ft
volume of bulk gas zone = 20,000 ac-ft
calculate the initial oil in place. (25 points)
Answers: 2
Geography, 23.06.2019 13:00
The creation of the trans-siberian railway allowed people to travel across russia. how could this railway impact russian culture?
Answers: 1
Geography, 23.06.2019 16:00
List 3 factors commonly used to select the location of a city
Answers: 1
Geography, 23.06.2019 17:10
Choose the item that is an example of the geographic theme of place.
Answers: 3
3. a field is a combination-drive reservoir. the current reservoir pressure is estimated at 2500 psi...
Medicine, 18.07.2019 18:20
Computers and Technology, 18.07.2019 18:20
Computers and Technology, 18.07.2019 18:20