Read the excerpt from The Building of Manhattan.
A temporary, small narrow-gauge track system was installed on each floor as it was needed. This enabled the material to be moved from the truck at ground level onto dump carts, raised by elevator to the designated floor, wheeled onto the track, and moved quickly to the exact spot needed. Turntables built into the track allowed the carts to be shifted about in any direction.
Which question can be answered only if an illustration accompanies the text?
What did turntables built into the track allow?
How were dump carts raised to designated floors?
When was a track system installed on a floor?
What does a turntable built into a track look like?
Answers: 2
English, 21.06.2019 19:10
Hhhhhhhhhheeeeeeeeeeeeeeeeeeeeelllllllllllllllpppppppppppp me
Answers: 1
English, 21.06.2019 21:00
What is the name of the built-in photo editor program on windows
Answers: 2
English, 21.06.2019 23:10
Write a 250-word essay in which you explain the theme of women’s strength and bravery in the poem.
Answers: 2
English, 21.06.2019 23:30
Buck did not cry out. he did not check himself, but drove in upon spitz, shoulder to shoulder, so hard that he missed the throat. they rolled over and over in the powdery snow. spitz gained his feet almost as though he had not been overthrown, slashing buck down the shoulder and leaping clear. twice his teeth clipped together, like the steel jaws of a trap, as he backed away for better footing, with lean and lifting lips that writhed and snarled. read this passage. explain what the conflict shows about buck and spitz.
Answers: 2
Read the excerpt from The Building of Manhattan.
A temporary, small narrow-gauge track system was i...
History, 02.04.2020 22:35
Biology, 02.04.2020 22:35
English, 02.04.2020 22:35
Mathematics, 02.04.2020 22:35
Mathematics, 02.04.2020 22:35
Mathematics, 02.04.2020 22:35
Mathematics, 02.04.2020 22:35
Mathematics, 02.04.2020 22:35