A 15 MW thermal power station has the following data: Cost of plant = $150 per kVA
Interest, taxes, insurance and depreciation rates = 25%
Cost of 11 kV-primary distribution system = $50000
Interest, taxes, insurance and depreciation rates = 10%
Annual fuel costs = $4Γ—105
Annual operation costs = $20000
Annual plant (fixed) maintenance costs = $10000
Annual plant (variable) maintenance costs = $15000
Maximum demand = 10 MW
Annual load factor = 50%
Power factor at generating power station terminals = 0.85 lagging
Determine the electrical supply tariff per unit at the consumers'
terminals, where:
- Plant reserve power is 10% over maximum generated power
demand.
- Efficiency of primary distribution system is 97%.
Find the percentage saving in electrical supply tariff served for the
consumers, if the load factor is raised to 75%.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afull journal bearing has a journal diameter of 27 mm, with a unilateral tolerance of -0.028 mm. the bushing bore has a diameter of 27.028 mm and a unilateral tolerance of 0.04 mm. the l/d ratio is 0.5. the load is 1.3 kn and the journal runs at 1200 rev/min. if the average viscosity is 50 mpa-s, find the minimum film thickness, the power loss, and the side flow for the minimum clearance assembly.
Answers: 1
question
Engineering, 04.07.2019 18:10
Items are similar to the free issue items, but their access is limited. (clo5) a)-bin stock items free issue b)-bin stock controlled issue c)-critical or insurance spares d)-rebuildable spares e)-consumables
Answers: 1
question
Engineering, 04.07.2019 18:20
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
question
Engineering, 04.07.2019 19:10
What are the major differences between injection molding and extrusion?
Answers: 2
You know the right answer?
A 15 MW thermal power station has the following data: Cost of plant = $150 per kVA
Interest,...
Questions
Questions on the website: 13722367