subject
Engineering, 01.12.2021 01:00 sruthivada

Contractor A is trying to decide whether it should purchase or lease new earth-moving equipment. If purchased, the equipment will cost $175,000 and is expected to be used six years at which time it can be sold for $72,000. At the midpoint of its life (year 3) an overhaul costing $20,000 must be performed. The equipment can be leased for $30,000 per year. Contractor A will not be responsible for the mid-life over haul if the equipment is leased. If the equipment is purchased it will be leased to other companies whenever possible; this is expected to yield revenues of $15,000 per year. The annual operating cost regardless of the decision will be approximately equal. What would you recommend in the MARR is 6%?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:20
Select any two (2) areas of applications of chain-drive. (clo4) a)-permanent lubrication necessary b)-hydraulic forklift truck operation c)-rigging and heavy moving materials d)-relatively high maintenance costs e)-costlier than belt drives
Answers: 2
You know the right answer?
Contractor A is trying to decide whether it should purchase or lease new earth-moving equipment. If...
Questions
question
Mathematics, 06.04.2021 04:30
question
Biology, 06.04.2021 04:30
question
Social Studies, 06.04.2021 04:30
Questions on the website: 13722361