subject
Engineering, 25.11.2021 06:50 yungking1329

A hot upset-forging operation is performed in an open die. Initial diameter of the cylindrical work part D0 = 30 mm, and its height h0 = 50 mm. The part is upset to an average diameter of Df = 45 mm. The work metal at this elevated temperature yields at sy = 90 MPa. Coefficient of friction at the die-work interface is μ = 0.40. Determine (a) the final height of the part and (b) the maximum force in the operation. Show all your work and provide a narrative of the steps you take.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
question
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:10
True or false (explain) (110)[111] is a slip system in bcc metals . the {111} family in fcc contains 8 planes. resolved shear stress (rss) in single crystals is just related to the applied stress. critical resolved shear stress (crss) in single crystal metals is direct proportional to the number of defects in the structure
Answers: 2
You know the right answer?
A hot upset-forging operation is performed in an open die. Initial diameter of the cylindrical work...
Questions
Questions on the website: 13722360